AGP Picks View all

Project Spotlight: US 60 improvements complete in Globe

GLOBE –  Two miles of US 60 through downtown Globe has a new pavement surface following completion of an Arizona Department of Transportation project.

The $4.7 million project removed and replaced the road surface between Santee Street and US 70, mileposts 250-252. Crews also made sidewalk, curb and gutter repairs in the project zone, as well as  guardrail and bridge improvements.

This two-mile stretch of US 60 runs through the heart of downtown Globe, seeing an average of 16,400 vehicles traveling through the area each day. The improved roadway pavement and updated safety elements are creating a safer, smoother drive for those making their way through this beautiful Arizona city.

To reduce traffic impacts, ADOT maintained at least one lane of traffic in each direction. This project supports ADOT’s commitment to safeguarding Arizona’s investment in highway pavement and to empowering the economy in Greater Arizona.

For more information, please visit US 60: Santee Street to US 70 Pavement Rehabilitation project page at azdot.gov/projects > Southeast District

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Economic News Observer

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.